1,200 km cross-border gas transmission pipeline with integrated SCADA monitoring. Delivered to ASME B31.8 standard across three countries.
Crossing three sovereign territories required simultaneous regulatory approvals in Kazakhstan, Uzbekistan and Turkmenistan, while extreme temperature swings (-45 °C to +55 °C) dictated specialised coating and cathodic protection systems.
A dedicated regulatory affairs team ran parallel approval tracks in all three countries. We selected a high-build epoxy-polyurethane coating system and installed impressed-current cathodic protection every 20 km, backed by a 400-node SCADA network for continuous integrity monitoring.
Pipeline commissioned on schedule, transporting 12 billion cubic metres of gas annually. SCADA network achieved 99.97% uptime in year one. The project received EBRD environmental and social compliance clearance.
Gallery



“Managing a cross-border pipeline of this complexity is a feat few contractors can achieve. Inanli's regulatory expertise and technical rigour made the difference.”
Alexei Voronov
VP Projects, Central Asia Energy Consortium